The system will have a storage capacity of minim 116.9600 MWh.
The contract targeting the Eurowind Energy Romania project, through the affiliate company Teius Solar S.R.L., represents the most important storage contract in Visual Fan’s portfolio. It is carried out through the division Renewable EPC by Allview, specialized in integrated solutions for the renewable energy infrastructure.
“This contract confirms the trajectory to which we have firmly committed: that of becoming a relevant player in the field of renewable energy. We built the Renewable EPC by Allview division out of the desire to deliver performance at the highest level in large-scale energy projects, including with storage systems. Developing a unitary approach allows us to coordinate each stage of a project – from concept and design, to implementation and final integration into the national energy system,” said Lucian Peticila, CEO of Visual Fan S.A.
The project is sustained by Romania’s Ministry of Energy, through non-reimbursable funds from the National Recovery and Resilience Plan (PNRR), Componenta C6 – Energie, under the measure “Supporting investments in new energy storage capacities (batteries)”.
Works will be executed in partnership with TQM Services S.R.L. and Voltlink S.R.L..
“The completion of this contract adds an important piece to our Teiuș project and reinforces our commitment to a modern and sustainable energy network. The collaboration with Visual Fan allows us to integrate an advanced storage solution, which makes the network more flexible and better prepared for the challenges of the future. We are glad that this step was possible with the support of the Ministry of Energy, through the PNRR. Storage is an essential part of our long-term strategy, and what we are building in Teiuș is a firm promise that we will continue to invest in projects that accelerate Romania’s green transition”, stated Adrian Dobre, Country Manager Eurowind Energy Romania.
Visual Fan, established in 2002 in the central city of Brasov, for 2024 reported consolidated turnover of RON131 million, lower by RON2 million against 2023, but its net profit climbed from RON6.6 million to RON11 million. The company’s general manager, Florentin Peticila, owns 82.2% of the share capital.
Eurowind Energy A/S is a Danish company focused on developing, constructing, and operating renewable energy parks. Its portfolio includes wind, solar, hydrogen, biogas, power-to-heat, and battery storage projects. Founded in 2006, the company has grown to employ over 675 people across 16 markets in Europe and the United States, with a strong presence in Romania since 2011.