These two centers are the last units of a package of 12 integrated centers built by Rompetrol on the A1 highway and completed in 2023 near Pecica, Orastie, Recas, Girmata, Sagu. The overall investment for all 12 centers exceeds USD$40 million, provided by the Kazakh Romanian Energy Investment Fun.
The construction and amenities works for the new service centers were completed in December 2023, and later on, the equipment was subject to checkups and tests, as well as obtaining the necessary and legal approvals for commissioning.
Having about 100 employees, each station is equipped with 3 multi-product pumps for cars, 1 fast diesel pump for large vehicles, an AdBlue pump, a liquefied petroleum gas (LPG) supply skid and 2 stations of fast and high-power electric charging, each with 4 charging stations.
“The next move is to open six new service centers (3 lots) with Rompetrol gas stations in Romania, respectively on the A3 highway (near Sanpaul – Mures) and the bypass options for the cities of Suceava and Brasov. These are already in progress, under various stages from design to obtaining the formal permits from the local authorities.” stated Laurentiu Coltanel, Network, Planning& Development Group Director.