The contract, worth around EUR18.4 million, covers design and technical assistance services and covers a period of 10 years and a half.
The new terminal will have an area of around 176,000 square meters and is designed for an estimated traffic of 30 million passengers annually by 2040.
The contract was won by the tie-up made up of Leviatan Design, as leader, and Ubitech Constructii (associate), together with several subcontractors and specialized designers.
The terminal will serve both regular airlines and low-cost ones and will be connected to road and rail infrastructure via new public transport stations, coaches and taxis.
(English version by Catalina Apostoiu)