The three projects will be located in Galati and Constanta counties and be equipped with 23 Vestas turbines. The turbine delivery is scheduled for the second half of 2026 and the parks are estimated to become operational in 2027.

Active on the local market since 2011, Eurowind Energy Romania develops and operates renewable energy projects, with a dedicated local team.

(English version by Catalina Apostoiu)