The supervision contract for the construction of the 35.12 km-long Timisoara-Lugoj highway section (segments 1 and 2) was won by French company Louis Berger, for RON23.05 million, without VAT. This result was challenged by Romanian consortium Omicron-Amepro-Septembrie Consulting.
The other contested contract is for the supervision of the 82 km-long Orastie-Sibiu section (sections 1-4). It was awarded to Consitrans-VIA Design-Omicron-Amepro for RON31.59 million, without VAT. The contestation was filed by Egis Romania-Ingedia Romania-Transproiect 2001.
Romanian consortium VIA Design-Omicron-Amepro-Consitrans will supervise the construction of the 38.9 km-long Nadlac-Arad section (segments 1 and 2), for RON20.7 million, without VAT.
The final awarded and unchallenged contract is for consultancy for the construction of the Lugoj-Deva section (27.4 km). It was won by Search Corporation-Consulgal Consultores de Engenharia e Gestao (Romania-Portugal), with an offer of RON18.35 million.