The project is financed with EU funds and with funds from CFR’s own revenue resources. Works should be finished in July 2012.
The contract awarding criteria considered the smallest price (60%) the technical offer (20%) and the duration of works (20%).
Iasi-based constructor and construction material producer West Star was set up in 1992. (EUR1=RON4.2972)