The 23.3-km railway section to be upgraded by consortium FCC Construccion (Spain) – Alpine Bau (Austria) – Azvi (Spain) is part of the Coslariu-Simeria sector (89.5 km) of the Pan-European Transport Corridor IV.
Works should be finished in 36 months and are guaranteed for 24 months, CFR said in a press release Friday.
The project is financed with non-reimbursable EU funds (85%) and funds from the state budget (15%). (EUR1=RON4.2912)